Last week the b.a.c class and I were working on the footpath for our new retaining wall. There was a few steps that we needed to do, first being getting the old bricks out, making a string line and trimming and boxing the edges. After those steps the civil engineering came up and was compacting rocks. We then put corrugated iron and split into groups on team one doing the concrete mix the other flatting and spreading concrete in the designated area. After all the cement was in we did the final smoothing of the concrete and gave the top of it a light sweep to create grip and mold prevention. Our last step was to put some fencing up and clean up all our tools and mess.